抗咸顶潮

salt tide prevention

  The cumulative power generated by the Xin'an River Hydropower Station, the first of its kind designed and built by China with domestically produced equipment, exceeded 100 terawatt-hours (TWh) at the end of August.

  This is equivalent to reducing standard coal consumption by 99.7 million tonnes, carbon dioxide emission by 40.1 million tonnes and sulfur dioxide emission by 3 million tonnes.

  Located in Jiande City of Zhejiang Province, Xin'an River Hydropower Station is a water control hub on the main stream of the upper Qiantang River.

  Besides power generation, the 60-year-old station has also served flood control, irrigation, tourism and salt tide prevention.

  我国第 一座自主设计建造、使用自制设备的新安江水电站,8月底累计发电量超过1000亿千瓦时。

  这一规模发电量相当于减少标煤消耗9970万吨,减排二氧化碳4001万吨、二氧化硫300万吨。新安江水电站位于浙江省建德市,是钱塘江上游干流的水利控制枢纽。

  除发电外,这座已有60年历史的电站还具有防洪、灌溉、旅游、抗咸顶潮等功能。

  点击查看讲义辅导资料及网校课程

  口译:翻译资格考试三级口译模拟题

  笔译:翻译资格考试三级笔译模拟题

  翻译资格资料来源考试网校老师主讲教材精讲班课程,完整讲义下载进入个人中心>>

    下载焚题库APP——翻译资格考试——题库——做题,包括章节练习、每日一练、模拟试卷、历年真题、易错题等,可随时随地刷题。【在线做题】>>】【下载APP掌上刷题

责编:wzj123 评论 纠错

报考指南

报名时间 报名流程 考试时间
报考条件 考试科目 考试级别
成绩查询 考试教材 考点名录
合格标准 证书管理 备考指导

更多

  • 考试题库
  • 模拟试题
  • 历年真题
  • 会计考试
  • 建筑工程
  • 职业资格
  • 医药考试
  • 外语考试
  • 学历考试