781. All expense including inspection fee and losses arising from the return of the goods and claims should be borne by you.
所有费用,包括商检费和因退货和索赔而造成的损失均由贵方承担。
782. You must hold responsible for all the losses caused by the delay in delivery of the goods.
你方必须对因延迟交货而给我方造成的一切损失负责。
783. You should take back all the disqualified goods and compensate us for the value of the goods plus all losses sustained due to return of the cargo, such as freight, storage charges, insurance premium, interest, and inspection charges.
贵方应该收回不合格产品并向我方作出赔偿,也包括因退货,如货运费、仓储费、保险费、利息、商检费等而造成的损失。
784. We have the right to claim against you for compensation of all losses.
我方有权向贵方提出赔偿我方的所有损失。
785. The products we received last Monday didn’t agree with the samples and feel that you should make it up.
我方上星期一收到的货物与样品不符,我方认为你们应该对此作出赔偿。
786. This is the survey report issued by CCIB in support of you claim.
这是中国商检局签发的检验报告一份,作为我方索赔的依据。
787. Almost everyone of the drums was leaking slightly. We must hold you responsible for the loss.
几乎每个桶都有点漏,你方应该赔偿我方的损失。
788. We have lost considerable business because of your delay in shipment. We expect compensation from you fro the loss.
由于贵方装船延误,导致我方失去了大量交易,望贵方给予补偿。
789. We request that you make up the short-landed goods covered by our contract No.147 promptly.
我们要求贵方迅速补偿我方合同第147号项下的短缺货物。
790. We regret to inform you that we are compelled to return the disqualified goods at your expense.
我们很遗憾地通知贵方,你们不得不退回贵方发送的不合格货品,运费由贵方承担。