PART TWO
Questions 8-12
Read this memorandum.
Choose the lest sentence from the list A-I to fill each of the blanks.
For each blank (8-12) mark one letter (A-I) on your Answer Sheet.
De not mark any letter twice.
One answer has teen given as an example.
MEMORANDUM
To: Filma Williams ,school of Architecture
From : Ram S. Johnson ,Physical Plant Operations
Subject : Air-conditioning Installation Costs for East Hall.
Date : 4.4.94
As you requested in your memo of March 15, we have studied the costs of installing air conditioning for the seven offices and two studio classrooms in Eest Hall ...example...
Office and Classroom installation
Estimates were obtained from three contractors on the costs of covering the offices and classrooms ...8...The work would take about three weeks.
BECause the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period...9... Sheet metal work to build out lest in the classes could be done on weekends , and the overtime labour costs of about $1,500 have been included in the estimates.
Arrangements were not made to do the office space installation on weekends `.. ... 10... ..
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways ,an additional $6 , 000 would be required for the equipment. .....11 ... If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way ...12...
Summary
the total job for the building would be about $ 35, 000 if done at one time. A two-stage installation would cost about $55 ,000. I can get official bids at your request.
Example: A
A As you suggested, we also sought information on the additional cost of air
conditioning in the entrance halls and stairways.
B All these three were in the $ 20,000 to $25,000 range.
C This later installation would cost about $20,000.
D However, class interruption should be minimal.
E In the same way, each of these three would take at least one month.
F therefore ,the total cost was this $6 ,000 plus another $5,000.
G Labour costs would be an additional S 5 ,000,bringing the total cost of the addition to $11 ,000.
H Each faculty member could expect to have workers in the office for about one day.
I So faculty members can continue their office work as usual.
8. B 9. D 10. H 11. G 12. C
一级建造师二级建造师二级建造师造价工程师土建职称公路检测工程师建筑八大员注册建筑师二级造价师监理工程师咨询工程师房地产估价师 城乡规划师结构工程师岩土工程师安全工程师设备监理师环境影响评价土地登记代理公路造价师公路监理师化工工程师暖通工程师给排水工程师计量工程师
执业药师执业医师卫生资格考试卫生高级职称执业护士初级护师主管护师住院医师临床执业医师临床助理医师中医执业医师中医助理医师中西医医师中西医助理口腔执业医师口腔助理医师公共卫生医师公卫助理医师实践技能内科主治医师外科主治医师中医内科主治儿科主治医师妇产科医师西药士/师中药士/师临床检验技师临床医学理论中医理论